Post-flood procedures
Post-flood procedures
Following the devastating floods in Queensland, NSW and Victoria, NECA has prepared procedures for the repair and verification of the electrical installation in flood-affected buildings.
NECA has been working with authorities and advisors nationwide to develop appropriate documentation to adequately cover the testing and rectification of electrical wiring for flood affected buildings. The below forms should only be used by licensed electrical contractors.
The electrical installation on any flood-affected building should be checked by a licensed electrical contractor for safety before reconnection to the supply.
The Electrical Contractor needs to able to provide evidence of adequate compliance to the verification and testing requirements of AS/ANZ3000 and this form provides a useful record.
Below are some guidelines contractors can use when repairing and verifying electrical installations.
Please choose a form from below:
- Verification of electrical wiring for flood affected buildings (doc 777kb)
- Workplace health and safety for repairs after floods (doc 62kb)
- Installation testing record sheet (doc 800kb)
